中国建筑科学研究院建筑防火研究所--消防规范网
严禁上传、处理、发送、转发涉密信息

目 录 上一节 下一节 查 找 检 索 手机阅读 总目录 问题反馈

 

英文索引


A
acesodyne gas 2.19
actual minimum wall thickness 4.4
adsorbed gas 2.11
allowable pressure 2.30
allowable stress 4.8
anaesthetic gas 2.18
application safety factor 4.6
asphyxiant gas 2.15
autofrettage 2.35
autofrettage pressure 2.36
B
bend test 5.11
bottom 3.21
breathing gas 2.16
hulge 5.19
bump protection ring 3.47
burst pressure 2.34
burst safety factor 4.5
bursting disc 3.38
butt joint 3.28
C
calculated wall thickness 4.1
circular groove 5.25
circumferential weld 3.26
coloured cylinder mark for gases 2.50
coloured mark for requalification of cylinders 2.51
composite gas cylinder 3.5
compressed gas 2.4
concave base 3.24
contraction end for joggle 3.50
convex base 3.23
crack 5.22
critical temperature 2.3
cryogenic liquid gas 2.8
cut-off valve 3.42
cuts 5.21
cylinder ear 3.46
cylinder for on-board storage of fuel for automotive vehicle 3.6
cylinder valve 3.33
cylindrical shell 3.15
D
deep stamping and drawing process 4.11
dents 5.17
design pressure 2.31
design stress factor 4.7
design wall thickness 4.2
dip tube 3.48
dip tube/eductor tube 3.56
direct volumetric expansion test 5.3
dissolved acetylene cylinder 3.4
dissolved gas 2.10
E
elastic volumetric expansion 5.5
excess-flow unit 3.58
F
fatigue failure 5.9
fiber-wrapped cylinder 3.7
filament stress ratio 2.49
fillet joint 3.31
filling ratio 2.42
filling stop unit 3.57
filling weight 2.43
fire damage 5.30
flammable gas 2.12
flattening test 5.10
folds 5.24
foot ring 3.22
free space 2.44
fully-wrapped cylinder 3.10
fusible plug 3.36
fusible plug device 3.35
fusible plug boss 3.37
G
gas 2.1
gas cylinder 2.25
gas metal arc welding(GMAW) 4.14
gas mixture 2.24
gas outlet 3.53
gas tungsten arc welding(GTAW) 4.15
gases filled in cylinder 2.2
gasket 3.49
general corrosion 5.29
gouges 5.20
H
H-type base 3.25
hammer examination 5.16
high pressure gas cylinder 2.26
high pressure liquefied gas 2.6
hoop-wrapped cylinder 3.9
hydraulic filling 2.45
hydraulic test pressure 2.32
I
inert gas 2.20
isolated corrosion 5.28
J
joggled joint 3.29
K
knuckle transition region between base and shell 3.20
L
lamination 5.23
lap joint 3.30
line corrosion 5.27
liner 3.12
liquefied gas 2.5
liquefied petroleum gas cylinder 3.3
liquid level indicator 3.43
longitudinal weld 3.27
low pressure gas cylinder 2.27
low pressure liquefied gas 2.7
M
mass of cylinder 2.46
maximum developed pressure 2.29
maximum working temperature 2.39
medical gas 2.17
N
neck 3.17
neck ring 3.18
nominal wall thickness 4.3
nominal water capacity 2.40
nominal working pressure 2.28
non-refillable cylinder valve 3.55
non-return valve 3.41
O
opening 3.16
P
permanent gas 2.4
permanent volumetri expansion 5.6
piercing and extruding process 4.10
pit corrosion 5.26
pits 5.18
porous mass 3.51
pressure cycling test 5.8
pressure relief device 3.34
pressure relief valve 3.39
pure gas 2.23
pyrophoric gas 2.13
R
rare gas 2.21
ratio of permanent volumetric expansion 5.7
reference temperature 2.38
refrigerant gas 2.9
refrigerated liquefied gas (cryogenic liquid gas) 2.8
reinforced layer 3.13
residual pressure valve 3.40
S
safety performance test 5.12
safety valve 3.39
seamless gas cylinder 3.1
settled pressure 2.37
shell 3.14
shield 3.45
shoulder 3.19
special gas 2.22
special threads for gas cylinders 3.52
submerged arc welding 4.13
T
tare 2.47
test mark ring 3.54
total volumetric expansion 5.4
toxic gas 2.14
tube closing-in process 4.12
V
valve boss 3.32
valve protection cap 3.44
visual inspection 5.15
volumetric expansion test 5.1
W
wall stress 4.9
water capacity 2.41
water jacket volumetric expansion test 5.2
weight with filling contents 2.48
welded gas cylinder 3.2
welded insulated gas cylinder 3.11
wire wound(over wrapped) gas cylinder 3.8
Y
yield pressure 2.33
yield temperature of fusible alloy 5.13
yield temperature of fusible plug 5.14

查找 上节 下节 返回
顶部

目录导航

气瓶术语 GB/T13005-2011
微信、QQ、手机浏览器等软件扫一扫 即可阅读

关闭